EBDRT FROM ST. CHARLES ROAD TO THE ILLINOIS PRAIRIE PATH (NORTH) PROJECT 

About

The DuPage County Division of Transportation (DuDOT) is leading a project for the East Branch DuPage River Trail from St. Charles Road to the Illinois Prairie Path. This project is near Phase I Study completion during which environmental and engineering studies were conducted for agency coordination. â€‹

 

Involved agencies include: 

 

This project will start the Phase II Study soon during which agency final approval will occur. The project team welcomes input on the proposed improvement plan. See Get Involved or the Contact webpage to share your thoughts.

 

Project Location

This project will extend the EBDRT approximately 1.3 miles south from St. Charles Road to the Illinois Prairie Path (IPP) passing through the Churchill Prairie Nature Preserve, Churchill Woods Forest Preserve, Tollway and Union Pacific Rail Road right-of-way, and Glenbard Wastewater Authority /Lombard property. 

​

See the map where you can scroll or zoom into any areas of interest.

Purpose

Once complete, the EBDRT will connect the Great Western Trail (GWT) and the Illinois Prairie Path via Churchill Woods.

Picnic shelter in wooded area

Project Milestones

Illinois Tollway Coordination | 2022-2023

  • Identified I-355 Underpass as preliminary preferred alternative to cross under UPRR

  • Resulted in Memorandum of Understanding (MOU) for a detailed I-355 underpass alternative evaluation

Phase I Preliminary Engineering and Environmental Studies | 2024-2026

  • Collect data and evaluate existing conditions

  • Identify preliminary route through FPDDC and GWA property

  • Evaluate near-term improvements on I-355

  • Consider Tollway operations and potential future I-355 conditions

  • Hold Public Information Meeting to gain stakeholder input on preferred alternative

  • UPRR, FPDDC, Villages, GWA, Tollway, and ComEd concurrence

Phase II Design Engineering | 2026 - 2027

  • Obtain final approvals for design and engineering plans

  • Acquire land and/or lease agreements from UPRR, COMED, and Tollway. 

Phase III Construction | TBD

  • The construction start date will depend on plan readiness, funding availability, and the status of any needed land acquisition

We Are Here

ALTERNATIVES 

The EBDRT alignment through Churchill Woods and the Glenbard Wastewater Authority property were coordinated with the involved agencies and designed to meet the project goals:

Route map: two locations connected

Safely connect the GWT to the IPP

Community support and shared heart

Provide a user-friendly community asset

Sun, water, trees, and fire: natural elements

Preserve high-quality ecosystems

Winding path, green trees

Combine with existing maintenance and access roads where possible

Flood warning alert icon

Maximize recreational benefits by balancing river proximity and flooding

Golden heron logo

Minimize new structures and wetland impacts

Preferred Alternative

From north to south, the preferred alternative includes:

  • Start EBDRT construction at its north termini at the Churchill Woods existing trailhead

  • Continue south along existing trails and access roads within Forest Preserve and COMED properties

  • Modify the I-355 slope wall to pass under the Crescent Boulevard, Union Pacific Railroad, and Hill Avenue bridges along the west side of I-355

  • Continue west along Hill Avenue and then south next to the Glenbard Wastewater Authority (GWA) access road

  • Connect with the existing GWA access road to meet the Illinois Prairie Path at its south termini

Click  on the image below to open the full-size file in a new window.

Proposed Typical Section.png
Proposed Typical Section Pedestrian Underpass.png

GET INVOLVED

Public involvement is essential as it allows stakeholders to provide input that addresses community concerns. Here are a few ways to stay involved and informed:

​

Revisit this Website

Learn about the project, download documents, or submit a comment.


Attend the Meeting
A public information meeting will be held to gain stakeholder feedback on the proposed improvement plan. Details are still being determined and will be posted on this website.


Add a Public Comment 

​

If you have questions or comments, please visit the Contact page

DuPage County Seal
East Branch DuPage River Trail Logo

A project of the DuPage County Division of Transportation (DuDOT)
421 N. County Farm Road
Wheaton, IL 60187